REDMOND, OR -- Central Oregon Community College is moving forward with plans for a solar farm at its Redmond campus.
The school recently signed an agreement with IGS Solar to install the solar system, which is designed to eventually provide 90% of the annual power needs for the four-building campus. IGS will own and operate the 504-kilowatt system, which will be maintained by Bend-based Sunlight Solar Energy.