KBND Logo

 

On Air Now

Mark Levin
ON AIR NOW
Mark Levin
3:00pm - 6:00pm
Contact

Infinite Menus, Copyright 2006, OpenCube Inc. All Rights Reserved.
Regional News


Portland is one of six markets where the Triple-A is testing a new roadside assistance truck for owners of electric cars.  It’s equipped with a compressed natural gas powered generator to re-charge electric vehicles when they run out of power. And it only takes about 15 minutes for a charge.   That's enough for the driver to get to a charging station.  Because of the high voltage produced by the generator; they have to use special grounding on the truck, and they extra careful when it's raining.

 

Traffic & Weather

  • Brookswood Blvd CLOSED >< Pinebrook and Lodgepole Dr. (5/14 - 9/4)
  • Bradbury Way closed through September 9th.
  • Lane Closure on Portland Avenue from College Way to 9th Street (9/1-3)
  • Southbound Lane closed on Boyd Acres Rd near Ross Road [South end] (8/27-31)
 
LinkedUpRadio Envisionwise Web Services