ON AIR NOW

Coast to Coast

9:00pm - 12:00am

Contact
Traffic Updates


Lane closure with Flaggers, SW Simpson from Century Dr. to 18th St. 8am-3pm (5/19-20)
Archie Briggs Rd closed near Mt. Washington Dr. (5/19-23)
Lane closure with Flaggers, Shevlin Parks Rd at NW Commons Dr. 7am-4pm (5/15-29)
US 26 in Warm Springs construction delays possible
US 97 7 miles North of Terrebonne, construction delays possible
US 97 <> Bend and Redmond construction delays possible
US 97 NB Rever exit from the Parkway is closed due to a crash. Ramps affected.
US 97 between Pinebrook and the 3rd Street/Business 97 exit; bridge construction in the median and shoulders. (7am-4pm)
Full road closure with detours Reed Mkt Rd from Fargo Lane to Daly Estates Dr./Camelot Pl.
Spotters, lane closures 3rd and Franklin, Walgreens construction (through July 1)

Traffic

 

 

  • Click on the link for the latest conditions on the mountain passes.

 

  • North 3rd St >< Division and O.B. Riley Rd, single lane N-Bound (6/15-8/30)
  • South 3rd St >< Wilson and Reed Ln, single lane closures South Bound 5a-2p (8/30)
  • Construction at 27th Street . Northbound Lane Closed from Ferguson to Bear Creek.  Detour in place.
  • O.B. Riley Road South-bound lane closed south of Mervin Samples Rd (12/17)
  • Butler Market East-bound lane closed E of 4th St. for sewer construction. (12/17)